Communications homework help needed with network cabling from The Sunshine Health Corporation

1.Network Cabling

The Sunshine Health Corporation has requested you evaluate their Scottsdale, Arizona facility. The original structure was built in 1965. The facility has undergone several remodels aesthetically, with no real infrastructure changes. The facility is wired with coaxial cable and RJ11 for telephone. In 1995 each office and the production facility were wired with Cat 3 cable. Much of this cabling still exists. In 2001, the executive offices were wired with Cat 5 cable.

Save your time - order a paper!

Get your paper written from scratch within the tight deadline. Our service is a reliable solution to all your troubles. Place an order on any task and we will take care of it. You won’t have to worry about the quality and deadlines

Order Paper Now

Upon inspection, none of the old cabling has been removed. The main communications room where telephone and networking equipment is housed has access to all the old cabling which is unlabeled. The client would like you to assess a modification plan for bringing this facility up to speed. Their previous contractor purchased several networking devices and was never able to get the equipment to operate at capacity. In your preliminary report, it was stated that wiring would need to be brought up to current networking needs in order to make best use of existing equipment. It appears there will be some need for upgrading equipment also as the wrong equipment was purchased.

For this assignment develop a plan of action for cleaning up the wiring structure, laying new fiber cable where necessary, and present the idea of developing wireless LANs, and Wi-Fi capability throughout the facility. Please discuss also potential cost savings upon completion of a plan.

The building is two stories of offices in the front of the building covering approximately 20,000 square feet between both floors. The remainder of the building is just over 200,000 square feet of two story warehouse that is used for storage in the very back, and manufacturing production in the front part a warehouse. All sections of the warehouse must have Internet capability as well as Intranet connectivity.

The assignment is rather broad and speaking in general terms. Have fun with this though please address the key areas. You also submit a proposed budget for the wiring, equipment, installation and testing. The assignment should be 2-3 pages of content not counting title page, reference page or appendices (diagrams, budget sheet, equipment list, etc.). Please follow APA format and use credible supporting materials to make your case.

Submit your work as an attachment.

 
"Looking for a Similar Assignment? Order now and Get 15% Discount! Use Code "FIRST15"

"Do you have an upcoming essay or assignment due?


Get any topic done in as little as 6 hours

If yes Order Similar Paper

All of our assignments are originally produced, unique, and free of plagiarism.