Warning: Trying to access array offset on value of type bool in /home/topgsnkq/myessaydesk.com/wp-content/themes/enfold/framework/php/function-set-avia-frontend.php on line 637

Engineering Mathematics

I need someone very good in Engineering mathematicsA new highway is to be constructed. Design A calls for a concrete pavement costing $7575per foot with a 1212 -yearlife; twotwopaved ditches costing $44per foot each; and threethreebox culverts every mile, each costing $7 comma 0007,000and having a 1212 -yearlife. Annual maintenance will cost $1 comma 7001,700per mile; the culverts must be cleaned every threethreeyears at a cost of $300300each per mile.Design B calls for a bituminous pavement costing $4040per foot with a 66 -yearlife; twotwosodded ditches costing $1.551.55per foot each; and twotwopipe culverts every mile, each costing $2 comma 1502,150and having a 66 -yearlife. The replacement culverts will cost $2 comma 3502,350each. Annual maintenance will cost $2 comma 7002,700per mile; the culverts must be cleaned yearly at a cost of $235235each per mile; and the annual ditch maintenance will cost $1.701.70per foot per ditch.Compare the two designs on the basis of equivalent worth per mile for a 1212 -yearperiod. Find the most economical design on the basis of AW and PW if the MARR is 1010 %per year.LOADING…Click the icon to view the interest and annuity table for discrete compounding when the MARR is 1010 %per year.

 
"Looking for a Similar Assignment? Order now and Get 15% Discount! Use Code "FIRST15"

"Do you have an upcoming essay or assignment due?


Get any topic done in as little as 6 hours

If yes Order Similar Paper

All of our assignments are originally produced, unique, and free of plagiarism.